Fees for transactions under the following legislation are available on this page.
Increased fees and charges apply from 1 July each year. The average increase is 4%. This table is updated to reflect the changes as soon as possible. To access the determination by which these fees have been set click here.
364.1
$33
364.2
365.1
365.2
$81
365.3
365.5
$436
299
Dangerous Substances (Explosives) Regulations 2004, Division 2.4.2 – Manufacturing licences*
Manufacturing licence: factory manufacture – a licence authorising the manufacture of explosives at a factory
$ 913.00
300
Manufacturing licence – a licence authorising the manufacture of explosives other than at a factory
$ 286.00
301
Dangerous Substances (Explosives) Regulations 2004, Division 2.5.2 – Import licences*
Import licence – a licence authorising the import of explosives
$ 107.00
302
Dangerous Substances (Explosives) Regulations 2004, Division 2.6.2 – Carrying licences*
Carrying licence – a licence authorising the carrying of explosives by road or rail (single vehicle)
fee per each additional vehicle
$ 151.00
$ 42.00
303
Dangerous Substances (Explosives) Regulations 2004, Division 2.6.3 – Explosives driving licences*
Explosives driving licence – a licence authorising the driving of vehicles to carry explosives
304
Dangerous Substances (Explosives) Regulations 2004, Division 2.7.2 – Storage licences*
Storage licence – a licence authorising the storage of explosives (single magazine)
fee per each additional magazine
$ 86.00
305
Dangerous Substances (Explosives) Regulations 2004, Division 2.8.2 – Supply licences*
Supply licence – a licence authorising the supply of explosives
306
Dangerous Substances (Explosives) Regulations 2004, Division 2.9.3 – Shotfirers’ licences*
Shot firer’s licence – a licence authorising the use of an explosive under part 2.9 of the Dangerous Substances (Explosives) Regulations 2004
$ 129.00
307
Dangerous Substances (Explosives) Regulations 2004, Division 2.9.4 – Blasting permits
Blasting permit – a permit authorising the operation at a premises stated in the blast plan
$ 465.00
309
Dangerous Substances (Explosives) Regulations 2004, Division 3.4.3 – Display operators’ licences*
Display operator’s licence – a licence authorising the use of fireworks for fireworks displays
310
Dangerous Substances (Explosives) Regulations 2004, Division 3.4.4 –Fireworks display permits
Fireworks display permit – a permit authorising the use of fireworks for a fireworks display or displays as stated in the permit (where the applicant holds a display operator’s licence)
$ 18.00
311
Fireworks display permit – a permit authorising the use of fireworks for a fireworks display or displays as stated in the permit (where the applicant does not hold a display operator’s licence)
$ 197.00
312
Dangerous Substances (General) Regulations 2004, Part 2.6 (Registrable premises – registration)
Two-year registration fee for registrable premises
$ 127.00
313
Dangerous Substances (General) Regulations 2004, Part 4.4 – Manufacturing security sensitive substances*
Security sensitive substances manufacturing licence – a licence authorising the manufacture of a security sensitive substance
314
Dangerous Substances (General) Regulations 2004, Part 4.5 – Importing security sensitive substances
Security sensitive substances import licence – a licence authorising the import of a security sensitive substance (fee per year – licence may be issued for up to three years)
Fee per year if this security sensitive substances activity is the second or subsequent activity authorised under the licence**
$ 51.00
315
Dangerous Substances (General) Regulations 2004, Part 4.6 – Carrying security sensitive substances
Security sensitive substances carrying licence – a licence authorising the carrying of a security sensitive substance by road or rail (fee per year – licence may be issued for up to three years)
316
Dangerous Substances (General) Regulations 2004, Part 4.7 – Storing security sensitive substances
Security sensitive substances storage licence – a licence authorising the storage of a security sensitive substance (fee per premises per year – licence may be issued for up to three years)
317
Dangerous Substances (General) Regulations 2004, Part 4.8 – Supplying security sensitive substances
Security sensitive substances supply licence – a licence authorising the supply of a security sensitive substance (fee per year – licence may be issued for up to three years)
318
Dangerous Substances (General) Regulations 2004, Part 4.9 – Using security sensitive substances
Security sensitive substances user licence – a licence authorising the use of a security sensitive substance (fee per year – licence may be issued for up to three years)
318.1
$ 41.00
* For licences issued authorising the handling of explosives under the Dangerous Substances (Explosives) Regulation 2004, the fee is a fee per year or part thereof for the period of the licence.
** The fee for a security sensitive substances licence for a single activity (excluding manufacture) is set at $107.00. Where a licence is issued for multiple security sensitive licence activities (via the same application and transaction), the fee for the second and subsequent activities is set at $51.00.
Examples:
1. A person applies for and is issued with a ‘security sensitive substances supply licence’. Cost of the licence is $107.00 per year.
2. A person applies for and is issued with a ‘security sensitive substances supply licence’ and a ‘security sensitive substances storage licence’. Cost of the licence is $158.00 per year ($107.00 + $51.00).
3. A person applies for and is issued with a ‘security sensitive substances supply licence’, a ‘security sensitive substances storage licence’ and a ‘security sensitive substances carrying licence’. Cost of the licence is $209.00 per year ($107.00 + $51.00 + $51.00).
4. A person applies for and is issued with a ‘security sensitive substances supply licence’. The cost of the licence is $107.00 per year. Later, the person applies for a ‘security sensitive substances storage licence’. The cost of that licence is also $107.00 per year.
319
Inspection of Boiler – locomotive, traction engine or road roller boilers, having a heating surface not exceeding 7.50 square metres – fee per inspection
$ 117.00
320
Inspection of Boiler – locomotive, traction engine or road roller boilers, having a heating surface exceeding 7.50 square metres – fee per inspection
$ 167.00
321
Inspection of Boiler – other than locomotive, traction engine or road roller boilers having a heating surface, not exceeding 2 square metres – including economiser and superheater (if any) – fee per inspection*
$ 45.00
322
Inspection of Boiler – other than locomotive, traction engine or road roller boilers having a heating surface, exceeding 2 square metres but not exceeding 5 square metres – including economiser and superheater (if any) – fee per inspection
$ 73.00
323
Inspection of Boiler – other than locomotive, traction engine or road roller boilers having a heating surface, exceeding 5 square metres but not exceeding 15 square metres – including economiser and superheater (if any) – fee per inspection
324
Inspection of Boiler – other than locomotive, traction engine or road roller boilers having a heating surface, exceeding 15 square metres but not exceeding 70 square metres – including economiser and superheater (if any) – fee per inspection
325
Inspection of Boiler – other than locomotive, traction engine or road roller boilers having a heating surface, exceeding 70 square metres but not exceeding 200 square metres – including economiser and superheater (if any) – fee per inspection
$ 216.00
326
Inspection of Boiler – other than locomotive, traction engine or road roller boilers having a heating surface, exceeding 200 square metres but not exceeding 400 square metres – including economiser and superheater (if any) – fee per inspection
$ 227.00
327
Inspection of Boiler – other than locomotive, traction engine or road roller boilers having a heating surface, exceeding 400 square metres -including economiser and superheater (if any)
plus per 100 metres or part thereof by which the heating surface exceeds 400 square metres
$ 276.00
$ 8.00
328
Inspection of Pressure Vessel – steam jacketed pan having internal diameter not exceeding 1 metre – fee per inspection*
$ 39.00
329
Inspection of Pressure Vessel – steam jacketed pan having internal diameter exceeding 1 metre – fee per inspection*
330
Inspection of Pressure Vessel – other pressure vessels having an internal capacity not exceeding 150 litres – fee per inspection*
331
Inspection of Pressure Vessel – other pressure vessels having an internal capacity exceeding 150 litres but not exceeding 1,500 litres – fee per inspection*
332
Inspection of Pressure Vessel – other pressure vessels having an internal capacity exceeding 1,500 litres but not exceeding 3,000 litres – fee per inspection
333
Inspection of Pressure Vessel – other pressure vessels having an internal capacity exceeding 3,000 litres – fee per inspection
$ 106.00
334
Other Inspections exempted vessel – fee per inspection
* Single Inspections: Where description of matter for which fee is payable in column 2 is marked * and on any one day in any one premises, an inspection is made of only one boiler or one pressure vessel, the fee to be charged for the inspection shall be 50 percent in excess of the fee otherwise payable.
* Multiple Inspections: Where on any one day in any one premises, five or more boilers or five or more pressure vessels are inspected, the fee to be charged for the inspection shall be 30 percent less than the fees otherwise payable.
342
Notification of Intention to commence building, excavation or compressed air work
a) work in relation to a single private dwelling house – for every $1,000 or part thereof by which the cost of the work exceeds $375,000.
$ 12.00
343
b) other work not related to a single private dwelling house – for every $2,000 or part thereof by which the cost of the work exceeds $22,000.
344
c) other work not related to a single private dwelling house
additional fee for every $1,000 or part thereof by which the cost of the work exceeds $210,000
$ 1,243.00$ 2.00
345
Design review of cranes, hoists, lifts, plant, scaffolding and gear
$ 48.00 minimumfee
plus$ 97.00 per hour
346
Lifts testing of lifts
$ 44.00 minimumfee
plus$ 29.00 per hour
347
Lifts re-testing of lifts (where initial test has failed inspection) – plus $73.15 per hour
$ 727.00 minimumfee
plus$ 83.00 per hour
348
Approval of lifts
$74.00
Workers Compensation Act 1951
349
Application Fee to be an approved insurer or an exempt employer for the purposes of workers compensation in the ACT
$6,434.00
350
Fee to be an approved insurer or an exempt employer for the purposes of workers compensation in the ACT (valid for three years)
Application for approval of packaging design
$385.00
Application for approval of segregation deviceApplication for reinspection of a segregation device that is refused approvalFee for reinspection of the device for each hour, or part thereof
$385.00$63.00$63.00
Application for an exemption, administrative determination, or approval; or variation of a determination or approval
Application for dangerous goods driver licence (new or renewal application)Application for replacement licence
$74.00$43.00
Application for dangerous goods vehicle licence (new or renewal) for one vehicle
Per additional vehicle
Application for reinspection of a vehicle that is refused approval
Fee for reinspection of the device for each hour, or part thereof
Application for replacement licence/label
$196.00
$53.00
$63.00
$43.00
Fees and charges are GST exempt.